Tons of Potassium Sulfate Project
General
CNBM is committed to building the best fertilizer factory for customers. With many years of experience in design and construction of potash fertilizer production line, our team continuously improve on technology and equipments of SOP production line, which can make more economic benefits and extend the lifetime of the equipments. CNBM built the SOP plant in many countries, such as Philippines, Indonesia, India, Egypt, etc. The high quality service has won the public praise for CNBM, the Clients are also willing to repurchase to expand the scale of production line. Although potash fertilizer production line is a mature technology, but CNBM has unique technology which is different from others. The proposal is is for potassium sulfate Plant with the capacity of 100,000MTPA in powder.
Reference list
No. | Case | Date |
1 | The project of SOP in Iran for 40,000 MTPA | In 2017 Year |
2 | The project of SOP granulation in Philippines for 10,000 MTPA | In 2015 Year |
3 | The project of SOP in Egypt for 100,000 MTPA | |
4 | The project of SOP in Egypt for 60,000 MTPA | |
5 | The project of SOP granulation in Egypt for 20,000 MTPA | |
6 | The project of SOP in Egypt for 20,000 MTPA | In 2013 Year |
7 | Technical consultant of Sop in Saudi for 20,000 MTPA | |
8 | Overhaul the furnace in Indonesia | In 2011 Year |
9 | The project of Calcium Chloride in Egypt for 30,000 MTPA | |
10 | The contractor of SOP in Philippines for 20,000MTPA | In 2008 Year |
11 | Overhaul the furnace in Indonesia | In 2007 Year |
12 | The contractor of SOP in Philippines for 10,000MTPA | In 2006 Year |
13 | The equipment supplier of SOP in Indonesia for 10,000MTPA | In 2004 Year |
14 | The contractor of SOP in Philippines for 10,000MTPA |
Scope of Supply
The project basic and detailed engineering design, including the process details, layouts, arrangements, technical specifications, and all other required items technical aspects.
Detailed engineering which will be required for the operation and maintenance of the plant.
Specifications and procurement of equipment as required for the use and operation of process.
Complete technical documentation and instructions required for fulfillment of erection, preparation for start-up, performance testing, operation and any other special equipment.
Equipment packing and China inland transportation and transport from China port to Iran port.
Supervision of Installation, commissioning and start-up of the plant.
Supply of erection material as piping, pipe fittings, valves, flanges, gaskets, bolting material, instrumentation, tubing, paints for protection against corrosion and heat insulation material.
Training of personnel at our site during the unit construction and initial operation.
Exclusion Items in Scope of Supply
Civil and Architecture detail design.
Civil construction, include plant and general buildings; lighting; lightening protection; communication system; road; pavement; etc.
Power substation; transformer system (becoming 380 V; 3 phase; 50 Hz), main-power cable and related system which out of the battery limit.
Emergency power supply system
Laboratory apparatus
Fire-fighting system.
Raw materials and part of utilities for this plant.
Any government permit related to the equipment; system; building utilization.
Local customs clearance and inland transportation to project site for import portion.
Any tax and duty in country where plant located.
Bank charges incurred outside of China
Round ticket of engineer,accommodation,meals, communication for engineer and workers
Working permit and such related expenses for overseas technicians/engineers and project management staffs.
Utilities consumption which used for the installation work including water, electric .etc.
The large equipments and tools for installation, which include crane, welder, cutting machine , forklift hoist ,other tools and assistant workers for installation.
Note: the sand, red brick and wooden for building furnace is not included in supply scope.
Battery Limits
Item | Battery Limit |
Raw Material | |
MOP | At inlet of feed hopper |
Sulphuric acid | Will be provided at the inlet of day tank in battery limits with isolation valve |
Product | |
Potassium Sulphate | Inlet of SOP Product Silo |
HCL | To HCL Pipeline of HCL Tank Farm |
Utilities | |
Compressed air | Will be provided at one point within battery limits with isolation valve |
Process water | Will be provided at one point within battery limits with isolation valve |
Cooling Water | Will be provided at one point within battery limits with isolation valve |
Natural gas | Will be provided at one point within battery limits with isolation valve |
Others
1.1 Chinese codes and standards shall be adopted during Engineering design. All equipment and material shall be made by the manufacturer with in China, including some manufacturer of Sino-foreign joint venture or some manufacturer adopted foreign technology.
1.2 CNBM has capability to make the supervision of installation for the Plant; precondition as below:
All the equipment should be on site;
The civil job should be finished, cleaning the site
The client should give good cooperation on labor and installation tools.
1.3 This proposal is made based on the normal condition of security, exclude Force Majeure. Once we receive Safety Precaution from Ministry of Foreign Affairs and Chinese Embassy, we will not dispatch workers to site and also can not guarantee the schedule.