Concrete Pump Parts Steel Pipe Delivery Pipe ST52 DN125

Product Description:

Used for concrete transportation in construction work 

Our concrete pump pipes have been successfully exported to many countries from 1998, Our main markets as below: Middle East, Southeast Asia, America, Brazil, Italy, Russia, South Africa etc.


Main Product Features:

  1. Application

    Used for concrete transportation in construction work

    Length

    1m-6m or according to the customer's  requirement

    Material

    ST52

    Thickness

    4.0mm/4.2mm/4.5mm/5mm/5.2mm/5.5mm.ect.

    Weight

    38KG/40KG/43KG/48KG/52KG

    Color

    as  clients required

    Using life

    12.000m³/15.000m³/25.000m³/35.000m³/50.000m³

    Collar

    148 or 157mmTwin wall flange

    Feature

    High Wear-resistant , long  service life , lower cost


Product Specifications:

Dimension: DN125

Length: 2m

Thickness: 4.1mm

Material: ST52

Characteristics: double-ends flange

Package: Seaworthy packing or as customers’ request.


FAQ:

Q1: How to confirm that your pipes could be used in our pump?

A1: We have been providing parts for nearly ten years, and cooperating with the agent of the world famous brand, possess near every kind of pipe in the market. What is more, we can produce as the customers’ request with drawing provided.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. 

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 5-15 workdays.

Q4: If we can produce some Concrete Pump Truck Parts according to customers request?

A4: Yes, we can produce Concrete Pump Truck Parts according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.