Box girder isone of the main structural components of the bridge engineering,the prefabricated box girder can be erected bythe bridge erecting machine after finishing the lower part of the project,which can accelerate the progress of the project, saving time. Our company usesthe factory management, standardized assembly-line; applications and process ofmechanization and automation, so that our products have the outstandingadvantages of reliable quality and controlled precision.
List of main equipments for girder fabricationfield
No. | Name | Remarks |
1 | Template | Steel mold of box girder |
2 | Steel banding tire fixtures |
|
3 | The lifting tire rack for tension equipment |
|
4 | The fixtures for prestressed reinforced tire positioning network |
|
5 | Vibrator and control system | Vibrate concrete inside the box girder’s mold. |
6 | Hydraulic station and control system | d with uniform and synchronization. |
7 | Mixing station | Mixing concretes for fabrication. |
8 | ZL50 Loader | Transporting aggregate. |
9 | Aggregate washing machine | Washing aggregate. |
10 | 10m³ Concrete truck | Transporting concrete jars. |
11 | 90m³/ Concrete pump | Transporting concrete from mixing station to fabric machine. |
12 | Concrete Distributor | Pouring concrete inside the mold quantitatively. |
13 | Pulp lifting and leveling machine |
|
14 | 38m-50t gantry crane |
|
15 | 17m-10t gantry crane |
|
16 | 24m-10t gantry crane |
|
17 | 6-12mm steel straightening machine |
|
18 | GQ40 steel cutting machine |
|
19 | GW40 steel bending machine |
|
20 | JW180 pulp mixing machine |
|
21 | Tensioning jack |
|
22 | 60t electronic truck scale |
|
24 | 900t tire handling machine | For box girder stripping, handling, palletizing. |
25 | 3kW pressure washer | Washing concrete equipment. |
26 | Utility vehicles | Transporting industrial vacuum cleaners, reinforced tray, plastic film reel. |
27 | Conservation film reel | Cover and pack up the conservation film in fabrication line. |
28 | Stripping oil jet | Jetting oil to the mold. |
29 | 13kW Vigorous cleaner | Cleaning up the mold crumbs. |
30 | Reinforced steel cut-to-length machine | Cut the prefabricated steel precisely. |
31 | Mold circulation heating system | . |
32 | Synchronous thermostat conservation system | |
33 | Reinforced steel cutting machine |
|
34 | 1000kV·A Substation and distribution system | Supplying electricity. |
35 | 6T Steam boiler and control system | Supplying heat. |
36 | 6m³ Air compressor | Generating compressed air, supplying production line’s technology and equipment with gas. |
37 | 500kW·A Spare generator | Reserving. |
38 | DNA03 Level instrument of high-precision | Measuring the flatness of the model |
39 | TCA1800 High-precision total station | Testing products. |
40 | 499V Resistance tester | Detecting reinforced node resistance |
41 | Automatic leveling test platform | Leveling track plate automatically to facilitate detection. |
42 | Reinforced tension monitor | For single reinforced tension detection. |