Product Name: JP50-p Small Diesel Mortar Pump for Plastering
1. Specification
Technical parameters
Model | — | JP50 -P |
Supply power | — | 220V/380V 50Hz |
Motor power | kw | 5.5 |
Maximum grain size | mm | 5 |
Output | l/min | 50 |
Delivery pressure | bar | 30 |
Horizontal delivery distance | m | 60 |
Vertical delivery distance | m | 30 |
Hopper volume | l | 50 |
Net weight | kg | 230 |
Dimension (L×W×H) | mm | 1650×560×750 |
1. 2. Application
JP50-P is small plastering machine introduced Italian upgraded technology o be manufactured. It’s applicable to delivery, bonding and plastering for various interior and exterior plastering mortar, masonry mortar, flooring mortar, decorative mortar, thermal insulation mortar, and floor surface mortar.
3. Package
Put into containers.
FAQ:
Q1: Why buy Materials & Equipment from ?
A1: All products have its ISO certifications, adheres to the highest standards and a commitment to supply chain safety and customer satisfaction.
Q2: How do we guarantee the quality of our products?
A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q3: How soon can we receive the product after purchase?
A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.
Q4: If we can produce JP50-p Small Diesel Mortar Pump for Plastering according to customers request?
A4: Yes, we can produce JP50-p Small Diesel Mortar Pump for Plastering according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.
Q5: How to make a quick resolution for after service?
A5: We have overseas branches all-around of world, If needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities &skilled personnel at site for training.
Images: