CNBM- Bridge Girder Launching Gantry Truss Girder for Bridge Construction hot sale

Product Description:

 

Lifting Capacity: 60-200T

Span Length: 20-50M

Operation method: Pendant control, remote control, operating cabin

 

Design Features of Bridge Girder Launching Gantry Truss Girder for Bridge Construction

1. Reliable performance

a) Apply the latest separate pinned structure of triangular space truss to main girder, so as to improve the stiffness and strength of whole crane.

b) Main girder is made of Q345 high strength steel, and melt into the latest design to ensure the main girder can work under high strength mode safely.

c) Modern crane brand launching crane is pioneering in continuous one time operation during bridge launching progress in China. It is of the most complete function launching crane for single machine domestically.

d) Compared with similar products from other supplier, Moderncrane brand launching crane have its unique design concept to the most difficult hole-span during bridge erection, in the way of laying side beam. So, it is safer to operate under high difficult and risk condition.

e) Powerful front, middle beam and three transom crane connect together to ensure transverse stability during bridge erection fully.

f) There is separate stroke switch control to each traveling mechanism, so as to decrease mutual collision between each traveling mechanism.

g) Overload resistance system: there is high performance weight limiter on two sets of trolleys, so if the lifting girder is overloading, the weight limiter will stop it at once.

h) There are normally three legs from other supplier. But we have four legs, including one front leg, one middle leg, one rear leg and one temporary leg.

i) Apply inner shrink leg to one time erect side beam in position and have more safety.

 

2. More powerful corrosion resistance

a) Strictly execute standard painting process to ensure blasting and painting quality.

b) Apply H steel enclosed section for main girder chord. Web chord is made by customized square tube to realize enclosed welding, which can avoid inner rust.

 

3. Higher working efficiency

a) There is traveling rail together with main girder, trolley and longitudinal crane. So, it is no need to lay traveling rail more. In this way, a lot of auxiliary materials are saved and production time is also saved.

b) Modern crane launching crane has higher working efficiency, with 6~8 pieces girder erection every day, based on enough concrete plate supplying, skilled operator and good condition at site.

 

4. More flexibility

a) It is symmetrically designed. Two way girder erections can be realized without split and slewing at original place.

b) Use one meter of hydraulic jack for front leg and rear leg. This design improves working efficiency, safety and flexibility largely.

c) Erect skew bridge by inclined way. Apply rotary face flange to connect each mechanism and structure, to erect 0~45°skew bridge. Side beam can be positioned one time for over 320m curve radius bridge.

 

5. Easier assembly and disassembly

a) Each structure is connected by pins and bolts to facilitate assembly.

b) Normally one set of launching crane can be assembled within 7days.