Tower Crane VFD PLC Slewing Mechanism TC7135

Maximum Lifting Weight: 16T Maximum Lifting Height(M): 200M Rated Loading Capacity: 3.5T
Span: 71M Rated Load Moment: 315T.M

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC7021(QTZ250) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

 

Technical Sheet for TC7135

 

Free standing   height (m)

50

Max height   with attachment (m)

200

Working range   can be adjustedm

5055606571

Min working   rangem

2.5

Max lifting   capacityt

16

Tip load @ 71mt

3.5

Hoist   mechanism (VFD+PLC)

Falls

2

4

Lifting   capacityt

04

08

08

016

Speedm/min

080

040

040

020

Motor

YZPBF280-8-55KW

Trolleying   mechanism (VFD+PLC)

Speedm/min

0-56

Motor

YPBE132M-4-7.5KW

Slewing   mechanism (VFD+PLC)

Speedr/min

0-0.6

Motor

YLEW112M-6-120N.M×2

Climbing speedm/min

0.5

Counterweightt

26

Mast section   sizeL×W×Hm

2×2×3

Working   temperature

-40+60

Total power (KW)

95

Power supply   requirement (KVA)

255KVA for   generator

Cable type (   within 30 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup   voltage & current

380V×95%=361V  260A

Rated working   voltage & current

380V  146A

 

Loading diagram

 

70m jib length

R

3.718.26

20

22

24

26

28

30

32

4 Falls (t)

16

14.48

13.02

11.8

10.77

9.89

9.12

8.45

R

34

36

38

40

42

44

46

48

4 Falls (t)

7.86

7.34

6.87

6.44

6.06

5.71

5.39

5.1

R

50

52

54

56

58

60

62

64

4 Falls (t)

4.84

4.59

4.36

4.15

3.95

3.76

3.59

3.43

R

66

68

70

4 Falls (t)

3.28

3.14

3

           

71m jib length

R

4.735.36

36

38

40

42

44

46

48

2 Falls (t)

8

7.98

7.38

6.96

6.58

6.24

5.93

5.64

R

50

52

54

56

58

60

62

64

2 Falls (t)

5.37

5.13

4.9

4.7

4.5

4.32

4.15

3.99

R

66

68

70

71

2 Falls (t)

3.84

3.7

3.56

3.5

 

65 m jib length

R

3.719.55

21

Snow Blade Loader Front Mounted, 4 Wheel Driving, 97KW Diesel Engine

yuchai YC55-8 5.5ton excavator